What are we doing about COVID-19? Read about it here

Caravan motorhome and trailer covers

If you’re looking to protect a caravan, motorhome, horse box or trailer, finding the best solution to protect it is paramount. It’s a considerable investment after all. As the original manufacturer of the tailored caravan cover, our covers ensure your vehicle is protected from the outside elements, keeping it in the best condition possible.

As official suppliers to some of the leading leisure manufacturers including; Coachman, Bailey, Swift Lunar and Elddis, you can be sure we’ll protect your vehicle.

Storage Covers
Caravan cover
Starting from £399.00
  • Tailor-made in our Yorkshire factory, to your specific make and model of caravan
  • Premium protective storage cover by the pioneers of the tailored caravan cover
  • Advanced fabric with soft non-scratch backing
  • Fully Waterproof and Breathable
  • Door Access, Aerial Pocket and A Frame Cover as standard
  • Choice of 3 colours
  • Free UK delivery
  • NCC Verified product
  • Current lead times approximately 2 weeks
Trailer Covers
Starting from £299.00
  • Tailor-made in our Yorkshire factory, to your specific make and model trailer or horse box
  • Premium protective cover by the pioneers of the tailored caravan cover
  • Advanced fabric with soft non-scratch backing
  • Fully waterproof and breathable
  • Door and additional access points (where required)
  • Choice of 3 colours
  • Free UK delivery
  • We have started Manufacturing as of the 26th May with a reduced staffing levels and lead times are approximately 6 weeks.

 

Motorhome Cover
Starting from £399.00
  • Tailor-made in our Yorkshire factory, to your specific make and model of motorhome
  • Premium protective storage cover by the pioneers of the tailored caravan cover
  • Advanced fabric with soft non-scratch backing
  • Fully Waterproof and Breathable
  • Door Access and Roof Furnishing Pockets as standard
  • Choice of 3 colours
  • Free UK delivery
  • NCC Verified product
  • We have started Manufacturing as of the 26th May with a reduced staffing levels and lead times are approximately 6 weeks